# Project estimate

Replace everything in [brackets]. Delete options that don’t apply.

---

## Estimate details

Estimate number: [Q-0001]
Date: [Date]
Valid until: [Date — e.g. 30 days]
Prepared for: [Client name and company]
Prepared by: [Your name and business]
Project: [Project name]

## Scope summary

[One or two sentences on the outcome and what you’ll deliver.]

## Price breakdown

| Item | Description | Qty / time | Rate | Amount |
| --- | --- | --- | --- | --- |
| Desk study | [Review of drawings and previous surveys] | [Qty] | [Rate] | [Amount] |
| Site inspection | [Two engineers, mezzanine and racking] | [Qty] | [Rate] | [Amount] |
| Load calculations | [Mezzanine floor and foundation checks] | [Qty] | [Rate] | [Amount] |
| Assessment report | [Findings, risk rating and options] | [Qty] | [Rate] | [Amount] |
| Review meeting | [Presentation to the client’s board] | [Qty] | [Rate] | [Amount] |

Subtotal: [Amount]
Tax: [If applicable]
Total: [Amount and currency]

## Included

- [Desk study note]
- [Site inspection record with photographs]
- [Load calculations for the mezzanine floor]
- [Assessment report with a risk rating and costed options]

## Not included

- [Intrusive testing or core sampling]
- [Design of remedial works]
- [Building control applications]

## Assumptions

- [Existing drawings and survey reports]
- [Safe access to the site on agreed dates]
- [A named person authorised to accept the report]

## Timeline

1. Desk study — [dates]
2. Site inspection — [dates]
3. Analysis — [dates]
4. Report and review — [dates]

## Terms

Deposit: [e.g. 30% on acceptance]
Payment schedule: [e.g. balance on delivery, 14 days]
Changes: [Work outside this scope is quoted separately before it starts]

## Acceptance

By signing, you accept this estimate and its terms.

Name: [Name]
Signature: [Signature]
Date: [Date]

---

## Before you send it

- [ ] Every item the client asked for is priced or excluded.
- [ ] Assumptions are written down.
- [ ] The validity date is set.
- [ ] The deposit and payment schedule are clear.
- [ ] There’s a clear way to accept.
- [ ] You’ve diarised a follow-up before it expires.

---

# Example: Ashdown Engineering Partners estimate for Kestrel Logistics

A filled-in example for a structural assessment of a distribution warehouse. Both companies are fictional.

## Price breakdown

| Item | Description | Qty / time | Rate | Amount |
| --- | --- | --- | --- | --- |
| Desk study | Review of drawings and previous surveys | 2 days | $1,150.00 | $2,300.00 |
| Site inspection | Two engineers, mezzanine and racking | 2 days | $1,600.00 | $3,200.00 |
| Load calculations | Mezzanine floor and foundation checks | 3 days | $1,150.00 | $3,450.00 |
| Assessment report | Findings, risk rating and options | Fixed fee | $2,800.00 | $2,800.00 |
| Review meeting | Presentation to the client’s board | Fixed fee | $750.00 | $750.00 |

## Total and terms

Total: $12,500.00 plus any applicable tax
Valid until: 30 days from the date above
Deposit: $3,750.00 (30%) on acceptance
Balance: On delivery, due in 14 days

## Not included

- Intrusive testing or core sampling
- Design of remedial works
- Building control applications

Template by Angelwood — https://angelwood.io/templates
